Serra Norte, Carajas: an iron ore operation in Brazil
Serra Norte, Carajas is an open-pit mine producing iron ore in Carajas, Para, Brazil, operated by Vale. The sources report 78.1 million metric tons (Mt), as printed in the 20-F iron ore production table; run-of-mine and feed for pelletizing plants; wet or dry not stated for CY2025; the basis is 100% of the complex, as reported by the owner and operator. Measured as usable ore, whole-operation output for CY2025 is 78,100,000 tonnes: about 3% of world iron ore output in 2025 and about 19% of Brazil's; it is one of 21 operations on this site whose output can be stated in usable ore.
Who owns and operates it?
| Owner | Interest | As of |
|---|---|---|
| Vale | 100% | 31 December 2025 |
How much does it produce?
| Period | Output | Basis | Where in the source |
|---|---|---|---|
| CY2025 | 78.1 million metric tons (Mt), as printed in the 20-F iron ore production table; run-of-mine and feed for pelletizing plants; wet or dry not stated | 100% of the complex, as reported by the owner and operator | printed p.47, Item 4, 1.1.2 Iron ore production table, row 'Serra Norte', 2025 column · Vale S.A. |
| CY2024 | 87.6 million metric tons (Mt), as printed in the 20-F iron ore production table; run-of-mine and feed for pelletizing plants; wet or dry not stated | 100% of the complex, as reported by the owner and operator | printed p.47, Item 4, 1.1.2 Iron ore production table, row 'Serra Norte', 2024 column · Vale S.A. |
Between CY2024 and CY2025 the reported figure fell by 10.8%, in the same unit and on the same basis.
How the usable-ore figure is worked out. Vale prints 78.1 million metric tons for the Serra Norte complex in 2025. Vale owns 100% of the Northern System and operates it. The unit is million metric tons as printed; the table does not say whether tonnes are wet or dry. World mine production of usable ore in 2025 was 2,600,000,000 tonnes (USGS Mineral Commodity Summaries 2026); Brazil produced 420,000,000 tonnes.
Of the 21 iron ore operations on this site with a stated usable-ore figure, Serra Norte, Carajas ranks 5th by whole-operation output. The largest, Western Australia Iron Ore (WAIO), is 291,164,000 tonnes; Serra Norte, Carajas is 27% of that. Periods and bases differ between operators, so the ranking is indicative.
Status: operating, as of 31 December 2025.
- Vale's 20-F says its production figures include third-party ore purchases, run-of-mine and feed for pelletizing plants, so the table is not saleable product and the share is indicative. The complex rows add to Vale's own production of 304.9 Mt in 2025; the 20-F prints third-party purchases of 31.2 Mt separately, for a total of 336.1 Mt.
- Vale describes the Northern System (Carajas, Para) as open pit mining of high-grade hematite with an iron grade around 66%; ore is railed on the Carajas railroad to the Ponta da Madeira maritime terminal.
- The Serra Norte complex has three main mining areas and three beneficiation plants, and the Gelado tailings dam is also dredged for ore (grade around 63%).
How does it compare?
The 7 iron ore operations on this site closest to Serra Norte, Carajas in whole-operation output, as stated by each operator (periods and bases differ, so the order is indicative):
| Rank | Operation | Country | Output (tonnes of usable-ore) | Operator |
|---|---|---|---|---|
| 2 | Hamersley mines (Rio Tinto Pilbara) | Australia | 229,605,000 | Rio Tinto |
| 3 | Fortescue Pilbara hematite operations | Australia | 192,300,000 | Fortescue |
| 4 | Serra Sul (S11D), Carajas | Brazil | 86,000,000 | Vale |
| 5 | Serra Norte, Carajas | Brazil | 78,100,000 | Vale |
| 6 | Hope Downs (Rio Tinto and Hancock Prospecting) | Australia | 36,751,000 | Rio Tinto |
| 7 | Vargem Grande complex | Brazil | 36,000,000 | Vale |
| 8 | Onslow Iron | Australia | 33,860,000 | — |
In Brazil: Serra Sul (S11D), Carajas, Itabira complex, Minas Centrais complex, Mariana complex, Vargem Grande complex and 3 more. See where iron ore comes from for the country totals, the country page for Brazil, and Vale for its other operations here.
Sources
- Vale S.A.: Annual Report on Form 20-F for the year ended 31 December 2025 (annual report (SEC Form 20-F, filed 2026-03-27), CY2025 with 2024 and 2023 comparatives). Opened 4 November 2026; used: printed pp.43-47 (iron ore operations, production table); also printed pp.52, 103-104.
- U.S. Geological Survey: Mineral Commodity Summaries 2026: Iron Ore (government statistical summary, 2025 (world and country mine production of usable ore)). Opened 3 November 2026; used: world and country mine production table, usable ore.
Method and limits
- What is compared. Operators print tonnes of ore: saleable production for most, run-of-mine and pelletizing feed for Vale, and shipments for Fortescue and Onslow Iron, mostly as wet tonnes. The figure is compared with the USGS usable-ore total, which does not state a moisture basis, so the share is indicative.
- Output is reported by the operator or owner, never estimated here; the basis column says whether a figure is the whole operation or an owner's share. The general rules for shares, partial lists and basis are on the methodology page.
- Made with AI assistance and checked against the documents above (how the site is made). To report an error, contact us; fixes are logged on the corrections page.