Fortescue Pilbara hematite operations: an iron ore operation in Australia

Fortescue Pilbara hematite operations is an integrated mine and processing complex producing iron ore in Pilbara region, Western Australia (mines, heavy-haul rail and Herb Elliott Port), Australia, operated by Fortescue. The sources report 192.3 thousand tonnes, converted from million wet metric tonnes (M wmt): ore shipped for FY2026 (Jul 2025 to Jun 2026); the basis is 100% of the operation, as reported by the operator. Measured as usable ore, whole-operation output for FY2026 (Jul 2025 to Jun 2026) is 192,300,000 tonnes: about 7.4% of world iron ore output in 2025 and about 20% of Australia's; it is one of 21 operations on this site whose output can be stated in usable ore.

Who owns and operates it?

Owners of Fortescue Pilbara hematite operations
OwnerInterestAs of
Fortescue (operator)
The quarterly report prints volumes on a 100% basis and a Fortescue-share shipments total of 198.5 Mt for FY2026 against 201.3 Mt in total; it prints no ownership percentage for the hematite operations.
—30 June 2026

Interests as of the date shown.

How much does it produce?

Reported output of Fortescue Pilbara hematite operations
PeriodOutputBasisWhere in the source
FY2026 (Jul 2025 to Jun 2026)192.3 thousand tonnes, converted from million wet metric tonnes (M wmt): ore shipped
Ore mined 213.0 M wmt and ore processed 192.2 M wmt are printed in the same table. The Marketing table splits total shipments of 201.3 M wmt by product, including Iron Bridge Concentrate at 9.0 M wmt.
100% of the operation, as reported by the operatorPDF p.3 (Page 3 of 6), 'Hematite Operations (M wmt)' table, row 'Ore shipped', FY26 column · Fortescue Ltd
FY2025 (Jul 2024 to Jun 2025)191.3 thousand tonnes, converted from million wet metric tonnes (M wmt): ore shipped100% of the operation, as reported by the operatorPDF p.3 (Page 3 of 6), same row, FY25 column · Fortescue Ltd

Between FY2025 (Jul 2024 to Jun 2025) and FY2026 (Jul 2025 to Jun 2026) the reported figure rose by 0.5%, in the same unit and on the same basis.

How the usable-ore figure is worked out. Fortescue prints 192.3 million wet metric tonnes of hematite ore shipped in FY2026 on a 100% basis. The report prints no saleable production line, so shipments are used; hematite ore processed is 192.2 million wet tonnes. World mine production of usable ore in 2025 was 2,600,000,000 tonnes (USGS Mineral Commodity Summaries 2026); Australia produced 980,000,000 tonnes.

Of the 21 iron ore operations on this site with a stated usable-ore figure, Fortescue Pilbara hematite operations ranks 3rd by whole-operation output. The largest, Western Australia Iron Ore (WAIO), is 291,164,000 tonnes; Fortescue Pilbara hematite operations is 66% of that. Periods and bases differ between operators, so the ranking is indicative.

The period (FY2026 (Jul 2025 to Jun 2026)) is not the calendar year of the USGS totals (2025), so the shares are approximate.

Status: operating, as of 30 June 2026.

How does it compare?

The 6 iron ore operations on this site closest to Fortescue Pilbara hematite operations in whole-operation output, as stated by each operator (periods and bases differ, so the order is indicative):

iron ore operations of similar size to Fortescue Pilbara hematite operations
RankOperationCountryOutput (tonnes of usable-ore)Operator
1Western Australia Iron Ore (WAIO)Australia291,164,000BHP
2Hamersley mines (Rio Tinto Pilbara)Australia229,605,000Rio Tinto
3Fortescue Pilbara hematite operationsAustralia192,300,000Fortescue
4Serra Sul (S11D), CarajasBrazil86,000,000Vale
5Serra Norte, CarajasBrazil78,100,000Vale
6Hope Downs (Rio Tinto and Hancock Prospecting)Australia36,751,000Rio Tinto

In Australia: Hamersley mines (Rio Tinto Pilbara), Hope Downs (Rio Tinto and Hancock Prospecting), Robe River - Robe Valley, Robe River - West Angelas, Western Australia Iron Ore (WAIO) and 2 more. See where iron ore comes from for the country totals, the country page for Australia, and Fortescue for its other operations here.