Hamersley mines (Rio Tinto Pilbara): an iron ore operation in Australia

Hamersley mines (Rio Tinto Pilbara) is an open-pit mine producing iron ore in Pilbara region, Western Australia, operated by Rio Tinto. The sources report 229,605 thousand tonnes ('000 t), marketable quantities of ore plus concentrates and pellets (saleable production) for CY2025; the basis is 100% of the operation, as reported by the operator (Total column). Measured as usable ore, whole-operation output for CY2025 is 229,605,000 tonnes: about 8.8% of world iron ore output in 2025 and about 23% of Australia's; it is one of 21 operations on this site whose output can be stated in usable ore.

Who owns and operates it?

Owners of Hamersley mines (Rio Tinto Pilbara)
OwnerInterestAs of
Rio Tinto (operator)
Rio Tinto lists the Hamersley Iron mines as 100% Rio Tinto. The Western Range mines are a joint venture (Bao-HI) in which Rio Tinto holds 54% and China Baowu Group 46%; under the joint venture terms Hamersley Iron buys all production, so the 100% row includes all Western Range output.
100%31 December 2025
China Baowu Group
Holds 46% of the Western Range joint venture only, not of the other Hamersley mines.
—31 December 2025

Interests as of the date shown.

How much does it produce?

Reported output of Hamersley mines (Rio Tinto Pilbara)
PeriodOutputBasisWhere in the source
CY2025229,605 thousand tonnes ('000 t), marketable quantities of ore plus concentrates and pellets (saleable production)100% of the operation, as reported by the operator (Total column)PDF p.279 (printed p.277), 'Metals and minerals production' table, IRON ORE ('000 tonnes), row 'Hamersley mines (Australia)', 2025 Total column · Rio Tinto
CY2024224,816 thousand tonnes ('000 t), marketable quantities of ore plus concentrates and pellets (saleable production)100% of the operation, as reported by the operator (Total column)PDF p.279 (printed p.277), 'Metals and minerals production' table, IRON ORE ('000 tonnes), row 'Hamersley mines (Australia)', 2024 Total column · Rio Tinto

Between CY2024 and CY2025 the reported figure rose by 2.1%, in the same unit and on the same basis.

How the usable-ore figure is worked out. Rio Tinto prints 229,605 thousand tonnes for the Hamersley mines row (100% of Paraburdoo, Mt Tom Price, Western Turner Syncline, Marandoo, Yandicoogina, Brockman, Nammuldi, Silvergrass, Channar, Gudai-Darri, Eastern Range and Western Range) as saleable production, after crushing, screening and beneficiation. The table does not say whether tonnes are wet or dry. World mine production of usable ore in 2025 was 2,600,000,000 tonnes (USGS Mineral Commodity Summaries 2026); Australia produced 980,000,000 tonnes.

Of the 21 iron ore operations on this site with a stated usable-ore figure, Hamersley mines (Rio Tinto Pilbara) ranks 2nd by whole-operation output. The largest, Western Australia Iron Ore (WAIO), is 291,164,000 tonnes; Hamersley mines (Rio Tinto Pilbara) is 79% of that. Periods and bases differ between operators, so the ranking is indicative.

Status: operating, as of 31 December 2025.

How does it compare?

The 5 iron ore operations on this site closest to Hamersley mines (Rio Tinto Pilbara) in whole-operation output, as stated by each operator (periods and bases differ, so the order is indicative):

iron ore operations of similar size to Hamersley mines (Rio Tinto Pilbara)
RankOperationCountryOutput (tonnes of usable-ore)Operator
1Western Australia Iron Ore (WAIO)Australia291,164,000BHP
2Hamersley mines (Rio Tinto Pilbara)Australia229,605,000Rio Tinto
3Fortescue Pilbara hematite operationsAustralia192,300,000Fortescue
4Serra Sul (S11D), CarajasBrazil86,000,000Vale
5Serra Norte, CarajasBrazil78,100,000Vale

In Australia: Hope Downs (Rio Tinto and Hancock Prospecting), Robe River - Robe Valley, Robe River - West Angelas, Western Australia Iron Ore (WAIO), Fortescue Pilbara hematite operations and 2 more. See where iron ore comes from for the country totals, the country page for Australia, and Rio Tinto for its other operations here.