Hamersley mines (Rio Tinto Pilbara): an iron ore operation in Australia
Hamersley mines (Rio Tinto Pilbara) is an open-pit mine producing iron ore in Pilbara region, Western Australia, operated by Rio Tinto. The sources report 229,605 thousand tonnes ('000 t), marketable quantities of ore plus concentrates and pellets (saleable production) for CY2025; the basis is 100% of the operation, as reported by the operator (Total column). Measured as usable ore, whole-operation output for CY2025 is 229,605,000 tonnes: about 8.8% of world iron ore output in 2025 and about 23% of Australia's; it is one of 21 operations on this site whose output can be stated in usable ore.
Who owns and operates it?
| Owner | Interest | As of |
|---|---|---|
| Rio Tinto | 100% | 31 December 2025 |
| China Baowu Group | — | 31 December 2025 |
How much does it produce?
| Period | Output | Basis | Where in the source |
|---|---|---|---|
| CY2025 | 229,605 thousand tonnes ('000 t), marketable quantities of ore plus concentrates and pellets (saleable production) | 100% of the operation, as reported by the operator (Total column) | PDF p.279 (printed p.277), 'Metals and minerals production' table, IRON ORE ('000 tonnes), row 'Hamersley mines (Australia)', 2025 Total column · Rio Tinto |
| CY2024 | 224,816 thousand tonnes ('000 t), marketable quantities of ore plus concentrates and pellets (saleable production) | 100% of the operation, as reported by the operator (Total column) | PDF p.279 (printed p.277), 'Metals and minerals production' table, IRON ORE ('000 tonnes), row 'Hamersley mines (Australia)', 2024 Total column · Rio Tinto |
Between CY2024 and CY2025 the reported figure rose by 2.1%, in the same unit and on the same basis.
How the usable-ore figure is worked out. Rio Tinto prints 229,605 thousand tonnes for the Hamersley mines row (100% of Paraburdoo, Mt Tom Price, Western Turner Syncline, Marandoo, Yandicoogina, Brockman, Nammuldi, Silvergrass, Channar, Gudai-Darri, Eastern Range and Western Range) as saleable production, after crushing, screening and beneficiation. The table does not say whether tonnes are wet or dry. World mine production of usable ore in 2025 was 2,600,000,000 tonnes (USGS Mineral Commodity Summaries 2026); Australia produced 980,000,000 tonnes.
Of the 21 iron ore operations on this site with a stated usable-ore figure, Hamersley mines (Rio Tinto Pilbara) ranks 2nd by whole-operation output. The largest, Western Australia Iron Ore (WAIO), is 291,164,000 tonnes; Hamersley mines (Rio Tinto Pilbara) is 79% of that. Periods and bases differ between operators, so the ranking is indicative.
Status: operating, as of 31 December 2025.
- Rio Tinto reports its Pilbara system as the Hamersley mines, Hope Downs, Robe Valley and West Angelas rows of the production table, which add to the 327.3 Mt of Pilbara production it prints on a 100% basis for 2025 (328.0 Mt in 2024). It defines the Pilbara segment as its holdings in Hamersley, the Hope Downs Joint Venture (50%), the Western Range Joint Venture (54%) and Robe River Iron Associates (65%; net beneficial interest 53%). Each physical operation is listed once; the 100% rows are used, not Rio Tinto's share.
- Rio Tinto prints one combined figure for the twelve mines named in note 9 of the production table and no per-mine split, so the mines are not listed separately here. Rio's Pilbara Blend, introduced for shipments from July 2025, averages 60.8% Fe (previously 61.6%) and is blended across Pilbara mines, so the grade does not belong to this row alone (PDF p.33).
How does it compare?
The 5 iron ore operations on this site closest to Hamersley mines (Rio Tinto Pilbara) in whole-operation output, as stated by each operator (periods and bases differ, so the order is indicative):
| Rank | Operation | Country | Output (tonnes of usable-ore) | Operator |
|---|---|---|---|---|
| 1 | Western Australia Iron Ore (WAIO) | Australia | 291,164,000 | BHP |
| 2 | Hamersley mines (Rio Tinto Pilbara) | Australia | 229,605,000 | Rio Tinto |
| 3 | Fortescue Pilbara hematite operations | Australia | 192,300,000 | Fortescue |
| 4 | Serra Sul (S11D), Carajas | Brazil | 86,000,000 | Vale |
| 5 | Serra Norte, Carajas | Brazil | 78,100,000 | Vale |
In Australia: Hope Downs (Rio Tinto and Hancock Prospecting), Robe River - Robe Valley, Robe River - West Angelas, Western Australia Iron Ore (WAIO), Fortescue Pilbara hematite operations and 2 more. See where iron ore comes from for the country totals, the country page for Australia, and Rio Tinto for its other operations here.
Sources
- Rio Tinto: Annual Report 2025 (annual report (furnished to the SEC on Form 6-K, February 2026), CY2025 with 2024 and 2023 comparatives). Opened 4 November 2026; used: PDF pp.33, 160, 271, 279, 317-320 (printed pp.31, 158, 269, 277, 315-318); also PDF p.338 (listing).
- U.S. Geological Survey: Mineral Commodity Summaries 2026: Iron Ore (government statistical summary, 2025 (world and country mine production of usable ore)). Opened 3 November 2026; used: world and country mine production table, usable ore.
Method and limits
- What is compared. Operators print tonnes of ore: saleable production for most, run-of-mine and pelletizing feed for Vale, and shipments for Fortescue and Onslow Iron, mostly as wet tonnes. The figure is compared with the USGS usable-ore total, which does not state a moisture basis, so the share is indicative.
- Output is reported by the operator or owner, never estimated here; the basis column says whether a figure is the whole operation or an owner's share. The general rules for shares, partial lists and basis are on the methodology page.
- Made with AI assistance and checked against the documents above (how the site is made). To report an error, contact us; fixes are logged on the corrections page.