Itabira complex: an iron ore operation in Brazil

Itabira complex is an open-pit mine producing iron ore in Iron Quadrangle, Minas Gerais, Brazil, operated by Vale. The sources report 25.2 million metric tons (Mt), as printed in the 20-F iron ore production table; run-of-mine and feed for pelletizing plants; wet or dry not stated for CY2025; the basis is 100% of the complex, as reported by the owner and operator. Measured as usable ore, whole-operation output for CY2025 is 25,200,000 tonnes: about 1% of world iron ore output in 2025 and about 6% of Brazil's; it is one of 21 operations on this site whose output can be stated in usable ore.

Who owns and operates it?

Owners of Itabira complex
OwnerInterestAs of
Vale (operator)
The 20-F gives the ownership interest of the Southeastern System as 100% and the operator as Vale S.A.
100%31 December 2025

Interests are as stated in the sources below on the date shown. Ownership changes with deals, so a stake may have changed since the date shown.

How much does it produce?

Reported output of Itabira complex
PeriodOutputBasisWhere in the source
CY202525.2 million metric tons (Mt), as printed in the 20-F iron ore production table; run-of-mine and feed for pelletizing plants; wet or dry not stated
Itabirite ore with an iron grade of 35-60%; the 20-F prints a beneficiation process recovery of 50.8% for Itabira in 2025.
100% of the complex, as reported by the owner and operatorprinted p.47, Item 4, 1.1.2 Iron ore production table, row 'Itabira', 2025 column · Vale S.A.
CY202429.8 million metric tons (Mt), as printed in the 20-F iron ore production table; run-of-mine and feed for pelletizing plants; wet or dry not stated100% of the complex, as reported by the owner and operatorprinted p.47, Item 4, 1.1.2 Iron ore production table, row 'Itabira', 2024 column · Vale S.A.

Between CY2024 and CY2025 the reported figure fell by 15.4%, in the same unit and on the same basis.

How the usable-ore figure is worked out. Vale prints 25.2 million metric tons for the Itabira complex in 2025. Vale owns 100% of the Southeastern System and operates it. The unit is million metric tons as printed; the table does not say whether tonnes are wet or dry. World mine production of usable ore in 2025 was 2,600,000,000 tonnes (USGS Mineral Commodity Summaries 2026); Brazil produced 420,000,000 tonnes.

Status: operating, as of 31 December 2025.

How does it compare?

Other iron ore operations on this site: Hamersley mines (Rio Tinto Pilbara), Hope Downs (Rio Tinto and Hancock Prospecting), Robe River - Robe Valley, Robe River - West Angelas, Iron Ore Company of Canada (IOC), Simandou Blocks 3 and 4 (SimFer), Western Australia Iron Ore (WAIO), Fortescue Pilbara hematite operations, Iron Bridge (magnetite), Onslow Iron, Serra Sul (S11D), Carajas, Serra Norte, Carajas. In Brazil: Serra Sul (S11D), Carajas, Serra Norte, Carajas, Minas Centrais complex, Mariana complex, Vargem Grande complex, Paraopeba complex, Serra Leste, Carajas, Minas-Rio. See where iron ore comes from for the country totals, the country page for Brazil, and Vale for its other operations here.