Paraopeba complex: an iron ore operation in Brazil

Paraopeba complex is an open-pit mine producing iron ore in Iron Quadrangle, Minas Gerais, Brazil, operated by Vale. The sources report 15.0 million metric tons (Mt), as printed in the 20-F iron ore production table; run-of-mine and feed for pelletizing plants; wet or dry not stated for CY2025; the basis is 100% of the complex, as reported by the owner and operator. Measured as usable ore, whole-operation output for CY2025 is 15,000,000 tonnes: about 0.6% of world iron ore output in 2025 and about 3.6% of Brazil's; it is one of 21 operations on this site whose output can be stated in usable ore.

Who owns and operates it?

Owners of Paraopeba complex
OwnerInterestAs of
Vale (operator)
The 20-F gives the ownership interest of the Southern System as 100% and the operator as Vale S.A.
100%31 December 2025

Interests as of the date shown.

How much does it produce?

Reported output of Paraopeba complex
PeriodOutputBasisWhere in the source
CY202515.0 million metric tons (Mt), as printed in the 20-F iron ore production table; run-of-mine and feed for pelletizing plants; wet or dry not stated
The 20-F prints a beneficiation process recovery of 80.0% for Paraopeba in 2025.
100% of the complex, as reported by the owner and operatorprinted p.47, Item 4, 1.1.2 Iron ore production table, row 'Paraopeba', 2025 column · Vale S.A.
CY202414.5 million metric tons (Mt), as printed in the 20-F iron ore production table; run-of-mine and feed for pelletizing plants; wet or dry not stated100% of the complex, as reported by the owner and operatorprinted p.47, Item 4, 1.1.2 Iron ore production table, row 'Paraopeba', 2024 column · Vale S.A.

Between CY2024 and CY2025 the reported figure rose by 3.4%, in the same unit and on the same basis.

How the usable-ore figure is worked out. Vale prints 15.0 million metric tons for the Paraopeba complex in 2025. Vale owns 100% of the Southern System and operates it. The unit is million metric tons as printed; the table does not say whether tonnes are wet or dry. World mine production of usable ore in 2025 was 2,600,000,000 tonnes (USGS Mineral Commodity Summaries 2026); Brazil produced 420,000,000 tonnes.

Of the 21 iron ore operations on this site with a stated usable-ore figure, Paraopeba complex ranks 18th by whole-operation output. The largest, Western Australia Iron Ore (WAIO), is 291,164,000 tonnes; Paraopeba complex is 5.2% of that. Periods and bases differ between operators, so the ranking is indicative.

Status: operating, as of 31 December 2025.

How does it compare?

The 7 iron ore operations on this site closest to Paraopeba complex in whole-operation output, as stated by each operator (periods and bases differ, so the order is indicative):

iron ore operations of similar size to Paraopeba complex
RankOperationCountryOutput (tonnes of usable-ore)Operator
15Minas-RioBrazil24,752,000Anglo American
16Iron Ore Company of Canada (IOC)Canada15,905,000Rio Tinto
17Donimalai Iron Ore Complex (Donimalai and Kumaraswamy pits)India15,600,000NMDC
18Paraopeba complexBrazil15,000,000Vale
19KolomelaSouth Africa10,795,000Kumba
20Iron Bridge (magnetite)Australia9,000,000—
21Serra Leste, CarajasBrazil6,000,000Vale

In Brazil: Serra Sul (S11D), Carajas, Serra Norte, Carajas, Itabira complex, Minas Centrais complex, Mariana complex and 3 more. See where iron ore comes from for the country totals, the country page for Brazil, and Vale for its other operations here.