Donimalai Iron Ore Complex (Donimalai and Kumaraswamy pits): an iron ore operation in India
Donimalai Iron Ore Complex (Donimalai and Kumaraswamy pits) is an open-pit mine producing iron ore in Bellary district, Karnataka, India, operated by NMDC. The sources report 15,600 thousand tonnes, converted from "15.6 MT" as printed for FY2025-26 (Apr 2025 to Mar 2026); the basis is as reported by the operator. Measured as usable ore, whole-operation output for FY2025-26 (Apr 2025 to Mar 2026) is 15,600,000 tonnes: about 0.6% of world iron ore output in 2025 and about 5% of India's; it is one of 21 operations on this site whose output can be stated in usable ore.
Who owns and operates it?
| Owner | Interest | As of |
|---|---|---|
| NMDC | — | 31 March 2026 |
How much does it produce?
| Period | Output | Basis | Where in the source |
|---|---|---|---|
| FY2025-26 (Apr 2025 to Mar 2026) | 15,600 thousand tonnes, converted from "15.6 MT" as printed | as reported by the operator | PDF p.46, Strategic Outlook, Donimalai: raise process efficiency and reduce haulage dependence; also PDF p.154 · NMDC Limited |
How the usable-ore figure is worked out. NMDC says the Donimalai complex produced 15.6 MT in FY2025-26 from the Donimalai and Kumaraswamy pits. The report rounds the figure to one decimal place and does not state wet or dry for this line; the company-wide production line is in wet metric tonnes. World mine production of usable ore in 2025 was 2,600,000,000 tonnes (USGS Mineral Commodity Summaries 2026); India produced 310,000,000 tonnes.
The period (FY2025-26 (Apr 2025 to Mar 2026)) is not the calendar year of the USGS totals (2025), so the shares are approximate.
Status: operating, as of 31 March 2026.
- NMDC's report says the complex has a pellet plant at Donimalai and that an in-pit crushing and conveying system is being implemented there (PDF pp.46 and 154).
How does it compare?
Other iron ore operations on this site: Hamersley mines (Rio Tinto Pilbara), Hope Downs (Rio Tinto and Hancock Prospecting), Robe River - Robe Valley, Robe River - West Angelas, Iron Ore Company of Canada (IOC), Simandou Blocks 3 and 4 (SimFer), Western Australia Iron Ore (WAIO), Fortescue Pilbara hematite operations, Iron Bridge (magnetite), Onslow Iron, Serra Sul (S11D), Carajas, Serra Norte, Carajas. In India: Bailadila (Kirandul and Bacheli complexes). See where iron ore comes from for the country totals, the country page for India, and NMDC for its other operations here.
Sources
- NMDC Limited: Integrated Annual Report 2025-26 (annual report (disclosed 2026-09-06), FY2025-26 (Apr 2025 to Mar 2026)). Opened 4 November 2026; used: PDF pp.17, 46, 154, 160, 186; also PDF pp.184, 188, 199.
- U.S. Geological Survey: Mineral Commodity Summaries 2026: Iron Ore (government statistical summary, 2025 (world and country mine production of usable ore)). Opened 3 November 2026; used: world and country mine production table, usable ore.
Method and limits
- Reported, not estimated. Output is the figure the operator or owner published, in the unit it used. This site does not estimate output where none is published.
- Shares. A share divides output in usable ore by the USGS world or country total for 2025. Where the operator's year is a fiscal year or the unit is a concentrate or a carbonate equivalent, the share is approximate or not given.
- What is compared. Operators print tonnes of ore: saleable production for most, run-of-mine and pelletizing feed for Vale, and shipments for Fortescue and Onslow Iron, mostly as wet tonnes. The figure is compared with the USGS usable-ore total, which does not state a moisture basis, so the share is indicative.
- Whole operation or owner's share. The basis column says which. A joint venture's output is never counted twice.
- Partial list. Only operations with a published figure are listed, so the rank is among those on this site, not among every iron ore mine. Shares of a country's output mix periods and bases, so treat them as indicative.
- Made with AI assistance, checked against sources. The facts were gathered from the documents above by AI-assisted research and re-checked against those documents by a second, independent pass; the page text is generated from the data. No professional review took place. How the site is made. To report an error, contact us; fixes are logged on the corrections page.