Rampura Agucha: a zinc operation in India
Rampura Agucha is an underground mine producing zinc in Rajasthan, India, operated by Hindustan Zinc. The sources report 534 thousand tonnes of zinc mined metal ('000 tonnes) for FY2026 (1 April 2025 to 31 March 2026); the basis is whole mine, as reported by Hindustan Zinc. In zinc content, whole-operation output for FY2026 (1 April 2025 to 31 March 2026) is 534,000 tonnes: about 4.1% of world zinc output in 2025 and about 61% of India's; it is one of 22 operations on this site whose output can be stated in zinc content.
Who owns and operates it?
| Owner | Interest | As of |
|---|---|---|
| Hindustan Zinc | — | 31 March 2026 |
How much does it produce?
| Period | Output | Basis | Where in the source |
|---|---|---|---|
| FY2026 (1 April 2025 to 31 March 2026) | 534 thousand tonnes of zinc mined metal ('000 tonnes) | whole mine, as reported by Hindustan Zinc | PDF p.73 (printed pp.142-143), table "8 underground mines | 5 locations | 16.61 Mnt total ore production", columns "Zinc Mined Metal", row Rampura Agucha Mine (RAM), FY2026 column · Hindustan Zinc Limited |
| FY2025 (1 April 2024 to 31 March 2025) | 515 thousand tonnes of zinc mined metal ('000 tonnes) | whole mine, as reported by Hindustan Zinc | PDF p.73 (printed pp.142-143), table "8 underground mines | 5 locations | 16.61 Mnt total ore production", columns "Zinc Mined Metal", row Rampura Agucha Mine (RAM), FY2025 column · Hindustan Zinc Limited |
Between FY2025 (1 April 2024 to 31 March 2025) and FY2026 (1 April 2025 to 31 March 2026) the reported figure rose by 3.7%, in the same unit and on the same basis.
How the zinc-content figure is worked out. Hindustan Zinc prints 534 thousand tonnes of zinc mined metal for this mine for FY2026 in its mine table. The table lists the mines it operates, so the figure covers the whole mine. World mine production of zinc in 2025 was 13,000,000 tonnes (USGS Mineral Commodity Summaries 2026); India produced 870,000 tonnes.
Of the 22 zinc operations on this site with a stated zinc-content figure, Rampura Agucha is the largest; the next, Red Dog, is 87% of its output. Periods and bases differ between operators, so the ranking is indicative.
The period (FY2026 (1 April 2025 to 31 March 2026)) is not the calendar year of the USGS totals (2025), so the shares are approximate.
Status: operating, as of 31 March 2026.
- Hindustan Zinc prints zinc mined metal and lead mined metal as separate columns for each mine; only the zinc column is used here.
- The mines-performance highlights in the same report print mined metal of 576 kt for the mine; the zinc (534 kt) and lead (42 kt) mined-metal figures in the table add up to that total.
How does it compare?
The 4 zinc operations on this site closest to Rampura Agucha in whole-operation output, as stated by each operator (periods and bases differ, so the order is indicative):
| Rank | Operation | Country | Output (tonnes of zinc-content) | Operator |
|---|---|---|---|---|
| 1 | Rampura Agucha | India | 534,000 | Hindustan Zinc |
| 2 | Red Dog | United States | 462,700 | Teck |
| 3 | Antamina (zinc) | Peru | 454,800 | — |
| 4 | Mount Isa (zinc) | Australia | 288,200 | Glencore |
In India: Sindesar Khurd, Zawar mines, Rajpura Dariba, Kayad. See where zinc comes from for the country totals, the country page for India, and Hindustan Zinc for its other operations here.
Sources
- Hindustan Zinc Limited: Integrated Annual Report FY2026 (annual report, FY2026 (1 April 2025 to 31 March 2026) and FY2025). Opened 4 November 2026; used: PDF pp.73 (printed pp.142-143), 158, 178, 185, 245, 74 (highlights).
- U.S. Geological Survey: Mineral Commodity Summaries 2026: Zinc (government statistical summary, 2025 (world and country mine production)). Opened 3 November 2026; used: world and country mine production table.
Method and limits
- Output is reported by the operator or owner, never estimated here; the basis column says whether a figure is the whole operation or an owner's share. The general rules for shares, partial lists and basis are on the methodology page.
- Made with AI assistance and checked against the documents above (how the site is made). To report an error, contact us; fixes are logged on the corrections page.