Aripuanã: a zinc operation in Brazil
Aripuanã is an underground mine producing zinc in Brazil, operated by Nexa Resources. The sources report 35.2 thousand tonnes of zinc contained in concentrates for CY2025; the basis is 100% of the mine, as reported by Nexa Resources. In zinc content, whole-operation output for CY2025 is 35,200 tonnes: about 0.3% of world zinc output in 2025; it is one of 22 operations on this site whose output can be stated in zinc content.
Who owns and operates it?
| Owner | Interest | As of |
|---|---|---|
| Nexa Resources | 100% | 31 December 2025 |
How much does it produce?
| Period | Output | Basis | Where in the source |
|---|---|---|---|
| CY2025 | 35.2 thousand tonnes of zinc contained in concentrates | 100% of the mine, as reported by Nexa Resources | printed p.35, Item 4 "Producing mines", Aripuanã paragraph: "approximately 35.2 thousand tonnes of zinc contained in concentrates"; Earnings release (Form 6-K) printed p.27, Aripuanã table "(100% basis)", row "Production - metal contained - Zinc", column 2025 · Nexa Resources S.A. |
| CY2024 | 31.6 thousand tonnes of zinc contained in concentrates | 100% of the mine, as reported by Nexa Resources | printed p.27, Aripuanã table "(100% basis)", row "Production - metal contained - Zinc", column 2024 · Nexa Resources S.A. |
Between CY2024 and CY2025 the reported figure rose by 11.4%, in the same unit and on the same basis.
How the zinc-content figure is worked out. Nexa Resources prints 35.2 thousand tonnes of zinc contained in concentrates produced by the Aripuanã mine in 2025, and its earnings release labels the mine table "100% basis". The figure covers the whole mine. World mine production of zinc in 2025 was 13,000,000 tonnes (USGS Mineral Commodity Summaries 2026).
Of the 22 zinc operations on this site with a stated zinc-content figure, Aripuanã ranks 20th by whole-operation output. The largest, Rampura Agucha, is 534,000 tonnes; Aripuanã is 6.6% of that. Periods and bases differ between operators, so the ranking is indicative.
Status: operating, as of 31 December 2025.
- The 20-F says the mine completed its ramp-up phase in June 2024.
How does it compare?
The 6 zinc operations on this site closest to Aripuanã in whole-operation output, as stated by each operator (periods and bases differ, so the order is indicative):
| Rank | Operation | Country | Output (tonnes of zinc-content) | Operator |
|---|---|---|---|---|
| 17 | El Porvenir | Peru | 53,100 | Nexa Resources |
| 18 | Rosebery | Australia | 48,597 | MMG |
| 19 | Rajpura Dariba | India | 47,000 | Hindustan Zinc |
| 20 | Aripuanã | Brazil | 35,200 | Nexa Resources |
| 21 | Kayad | India | 32,000 | Hindustan Zinc |
| 22 | Atacocha | Peru | 11,900 | Nexa Resources |
In Brazil: Vazante. See where zinc comes from for the country totals, the country page for Brazil, and Nexa Resources for its other operations here.
Sources
- Nexa Resources S.A.: Annual Report on Form 20-F for the fiscal year ended December 31, 2025 (annual report (SEC 20-F), CY2025). Opened 4 November 2026; used: printed pp.34-35 (Item 4, Producing mines); cover and definitions.
- Nexa Resources S.A.: Earnings Release 4Q25 and FY2025 (Form 6-K Exhibit 99.1, 26 February 2026) (results release (SEC 6-K exhibit), CY2025 and CY2024). Opened 4 November 2026; used: printed pp.22, 23, 25, 26, 27 (mine tables, "100% basis").
- U.S. Geological Survey: Mineral Commodity Summaries 2026: Zinc (government statistical summary, 2025 (world and country mine production)). Opened 3 November 2026; used: world and country mine production table.
Method and limits
- Output is reported by the operator or owner, never estimated here; the basis column says whether a figure is the whole operation or an owner's share. The general rules for shares, partial lists and basis are on the methodology page.
- Made with AI assistance and checked against the documents above (how the site is made). To report an error, contact us; fixes are logged on the corrections page.