Vatomina is a mine producing graphite in Madagascar, operated by Tirupati Graphite. The sources report 2,169 Mt as printed in the table 'Key operating results from Madagascar Operations', row 'Total Production' (metric tonnes of graphite) for FY2025 (1 April 2024 to 31 March 2025); the basis is 100% of the Group's Madagascar operations, which the report attributes to Vatomina only, as reported by the operator. The sources do not give a whole-operation figure in natural graphite that can be compared with world output, so no share is computed.
Who owns and operates it?
| Owner | Interest | As of |
|---|---|---|
| Tirupati Graphite | — | 31 March 2025 |
How much does it produce?
| Period | Output | Basis | Where in the source |
|---|---|---|---|
| FY2025 (1 April 2024 to 31 March 2025) | 2,169 Mt as printed in the table 'Key operating results from Madagascar Operations', row 'Total Production' (metric tonnes of graphite) | 100% of the Group's Madagascar operations, which the report attributes to Vatomina only, as reported by the operator | PDF p.13 (printed p.13), table Key operating results from Madagascar Operations, row 'Total Production', FY 2024-25 column; PDF p.10, 'Annual production was 2,169 Mt for the year to 31 March 2025 from just the Vatomina mine'; PDF p.7, Strategic Report · Tirupati Graphite plc |
| FY2024 (1 April 2023 to 31 March 2024) | 7,096 Mt as printed ('Total Production') | Group total for the Madagascar operations, as reported by the operator | PDF p.13, same table and row, FY 2023-24 column; PDF p.10 ('2024: 7,096 Mt, 2023: 3,893 Mt') · Tirupati Graphite plc |
| 1 April 2025 to 30 September 2025 | 2,390 Mt as printed | Vatomina, as reported by the operator | PDF p.10, Madagascar Graphite Projects, 'between 1 April and 30 September 2025, the Vatomina operation produced 2,390 Mt'; PDF p.12 for the monthly figures · Tirupati Graphite plc |
Status: suspended, as of 15 September 2025.
- USGS prints 80,000 t for Madagascar in 2025 (estimated).
- The table prints the unit as 'Mt'; the report elsewhere gives the average selling price per Mt of graphite sold as a price per tonne. Production is for the 12 months to 31 March 2025, not a calendar year, and the report gives no 100% basis statement, so no share of world output is computed.
How does it compare?
Other graphite operations on this site: Balama Graphite Operation, Beishan Mine (China Graphite Group).
See where graphite comes from for the country totals, the country page for Madagascar, and Tirupati Graphite for its other operations here.
Sources
- Tirupati Graphite plc: Annual report and financial statements for the year ended 31 March 2025 (annual report (company website copy, published 13 March 2026), FY2025 (1 April 2024 to 31 March 2025), with FY2024 comparatives and events to the publication date). Opened 6 November 2026; used: PDF pp.3, 7, 10, 12, 13, 29, 102 (PDF page number equals printed page number).
- U.S. Geological Survey: Mineral Commodity Summaries 2026: Graphite (Natural) (government statistical summary, 2025 (world and country natural graphite mine production)). Opened 3 November 2026; used: world mine production and reserves table.
Method and limits
- What is compared. Operators print tonnes of graphite concentrate or product. USGS does not state the product form of its mine production, so the share is indicative.
- Output is reported by the operator or owner, never estimated here; the basis column says whether a figure is the whole operation or an owner's share. The general rules for shares, partial lists and basis are on the methodology page.
- Made with AI assistance and checked against the documents above (how the site is made). To report an error, contact us; fixes are logged on the corrections page.