Garpenberg (lead): a lead operation in Sweden
Garpenberg (lead) is a mine producing lead in Sweden, operated by Boliden. The sources report 38,692 tonnes of lead, 'Production of metal in concentrate' for CY2025 (year ended 31 December 2025); the basis is whole mine, as reported by Boliden. In lead content, whole-operation output for CY2025 is 38,692 tonnes: about 0.9% of world lead output in 2025 and about 55% of Sweden's; it is one of 11 operations on this site whose output can be stated in lead content.
Who owns and operates it?
| Owner | Interest | As of |
|---|---|---|
| Boliden | — | 31 December 2025 |
How much does it produce?
| Period | Output | Basis | Where in the source |
|---|---|---|---|
| CY2025 (year ended 31 December 2025) | 38,692 tonnes of lead, 'Production of metal in concentrate' | whole mine, as reported by Boliden | PDF p.37 (printed p.37), table 'Full-year data per unit - Mines', Garpenberg, row 'Production of metal in concentrate - Lead, tonnes', column 2025 · Boliden AB |
| CY2024 (year ended 31 December 2024) | 40,439 tonnes of lead, 'Production of metal in concentrate' | whole mine, as reported by Boliden | PDF p.37 (printed p.37), table 'Full-year data per unit - Mines', Garpenberg, row 'Production of metal in concentrate - Lead, tonnes', column 2024 · Boliden AB |
Between CY2024 (year ended 31 December 2024) and CY2025 (year ended 31 December 2025) the reported figure fell by 4.3%, in the same unit and on the same basis.
How the lead-content figure is worked out. Boliden prints 38,692 tonnes of lead as metal in concentrate for Garpenberg for the full year 2025 in its unit table. This is contained lead for the whole mine. World mine production of lead in 2025 was 4,500,000 tonnes (USGS Mineral Commodity Summaries 2026); Sweden produced 70,000 tonnes.
Of the 11 lead operations on this site with a stated lead-content figure, Garpenberg (lead) ranks 6th by whole-operation output. The largest, Red Dog (lead), is 107,000 tonnes; Garpenberg (lead) is 36% of that. Periods and bases differ between operators, so the ranking is indicative.
Status: operating, as of 31 December 2025.
- Boliden reports 3,585 kilotonnes of milled ore at a head grade of 1.3% lead in 2025 for Garpenberg.
- Boliden prints 101,780 tonnes of zinc as metal in concentrate for the same mine (see the zinc entry garpenberg).
- Garpenberg (38,692 t) and Zinkgruvan (30,004 t) together are 68,696 t, compared with USGS 70,000 t for Sweden in 2025 (estimated).
How does it compare?
The 7 lead operations on this site closest to Garpenberg (lead) in whole-operation output, as stated by each operator (periods and bases differ, so the order is indicative):
| Rank | Operation | Country | Output (tonnes of lead-content) | Operator |
|---|---|---|---|---|
| 3 | Sindesar Khurd (lead) | India | 84,000 | Hindustan Zinc |
| 4 | McArthur River (lead) | Australia | 52,300 | Glencore |
| 5 | Rampura Agucha (lead) | India | 42,000 | Hindustan Zinc |
| 6 | Garpenberg (lead) | Sweden | 38,692 | Boliden |
| 7 | Zinkgruvan (lead) | Sweden | 30,004 | Boliden |
| 8 | El Porvenir (lead) | Peru | 25,200 | Nexa Resources |
| 9 | Southern Copper IMMSA unit (unit total) | Mexico | 24,900 | Southern Copper |
In Sweden: Zinkgruvan (lead). See where lead comes from for the country totals, the country page for Sweden, and Boliden for its other operations here.
The same site is also listed for another commodity: Garpenberg (zinc).
Sources
- Boliden AB: Annual and Sustainability Report 2025 (annual report, CY2025). Opened 6 November 2026; used: PDF p.58 (printed p.56), PDF p.134 (printed p.132).
- Boliden AB: Interim Report for the fourth quarter and year-end report 2025 (Stockholm, 3 February 2026) (interim and year-end report, CY2025 and CY2024). Opened 6 November 2026; used: PDF pp.27, 37, 40 (PDF page numbers equal printed page numbers).
- U.S. Geological Survey: Mineral Commodity Summaries 2026: Lead (government statistical summary, 2025 (world and country mine production)). Opened 3 November 2026; used: world and country mine production table.
Method and limits
- Output is reported by the operator or owner, never estimated here; the basis column says whether a figure is the whole operation or an owner's share. The general rules for shares, partial lists and basis are on the methodology page.
- Made with AI assistance and checked against the documents above (how the site is made). To report an error, contact us; fixes are logged on the corrections page.