El Porvenir (lead): a lead operation in Peru
El Porvenir (lead) is an underground mine producing lead in Peru (part of the Cerro Pasco Complex), Peru, operated by Nexa Resources. The sources report 25.2 thousand tonnes of lead contained in concentrates for CY2025 (year ended 31 December 2025); the basis is 100% of the mine, as reported by Nexa Resources. In lead content, whole-operation output for CY2025 is 25,200 tonnes: about 0.6% of world lead output in 2025 and about 8.7% of Peru's; it is one of 11 operations on this site whose output can be stated in lead content.
Who owns and operates it?
| Owner | Interest | As of |
|---|---|---|
| Nexa Resources | 83.55% | 31 December 2025 |
How much does it produce?
| Period | Output | Basis | Where in the source |
|---|---|---|---|
| CY2025 (year ended 31 December 2025) | 25.2 thousand tonnes of lead contained in concentrates | 100% of the mine, as reported by Nexa Resources | printed p.34, Item 4 "Producing mines", El Porvenir paragraph: "25.2 thousand tonnes of lead contained in concentrates"; Earnings release (Form 6-K) printed p.23, El Porvenir table "(100% basis)", row "Production - metal contained - Lead", column 2025 · Nexa Resources S.A. |
| CY2024 (year ended 31 December 2024) | 26.8 thousand tonnes of lead contained in concentrates | 100% of the mine, as reported by Nexa Resources | printed p.23, El Porvenir table "(100% basis)", row "Production - metal contained - Lead", column 2024 · Nexa Resources S.A. |
Between CY2024 (year ended 31 December 2024) and CY2025 (year ended 31 December 2025) the reported figure fell by 6.0%, in the same unit and on the same basis.
How the lead-content figure is worked out. Nexa Resources prints 25.2 thousand tonnes of lead contained in concentrates produced by the El Porvenir mine in 2025, and its earnings release labels the mine table "100% basis". The figure covers the whole mine. World mine production of lead in 2025 was 4,500,000 tonnes (USGS Mineral Commodity Summaries 2026); Peru produced 290,000 tonnes.
Of the 11 lead operations on this site with a stated lead-content figure, El Porvenir (lead) ranks 8th by whole-operation output. The largest, Red Dog (lead), is 107,000 tonnes; El Porvenir (lead) is 24% of that. Periods and bases differ between operators, so the ranking is indicative.
Status: operating, as of 31 December 2025.
- The 20-F lists El Porvenir as part of the Cerro Pasco Complex. The 20-F prints 53.1 thousand tonnes of zinc contained in concentrates for the same mine (see the zinc entry el-porvenir).
- USGS prints 290,000 t of lead for Peru in 2025 (estimated).
How does it compare?
The 7 lead operations on this site closest to El Porvenir (lead) in whole-operation output, as stated by each operator (periods and bases differ, so the order is indicative):
| Rank | Operation | Country | Output (tonnes of lead-content) | Operator |
|---|---|---|---|---|
| 5 | Rampura Agucha (lead) | India | 42,000 | Hindustan Zinc |
| 6 | Garpenberg (lead) | Sweden | 38,692 | Boliden |
| 7 | Zinkgruvan (lead) | Sweden | 30,004 | Boliden |
| 8 | El Porvenir (lead) | Peru | 25,200 | Nexa Resources |
| 9 | Southern Copper IMMSA unit (unit total) | Mexico | 24,900 | Southern Copper |
| 10 | Dugald River (lead) | Australia | 21,666 | MMG |
| 11 | Aripuanã (lead) | Brazil | 13,000 | Nexa Resources |
In Peru: Yauli unit (Volcan, unit total of three mines). See where lead comes from for the country totals, the country page for Peru, and Nexa Resources for its other operations here.
The same site is also listed for another commodity: El Porvenir (zinc).
Sources
- Nexa Resources S.A.: Annual Report on Form 20-F for the fiscal year ended December 31, 2025 (annual report (SEC 20-F), CY2025). Opened 6 November 2026; used: printed pp.34-35 (Item 4, Producing mines); cover page.
- Nexa Resources S.A.: Earnings Release 4Q25 and FY2025 (Form 6-K Exhibit 99.1, 26 February 2026) (results release (SEC 6-K exhibit), CY2025 and CY2024). Opened 6 November 2026; used: printed pp.23, 27 (mine tables, "100% basis").
- U.S. Geological Survey: Mineral Commodity Summaries 2026: Lead (government statistical summary, 2025 (world and country mine production)). Opened 3 November 2026; used: world and country mine production table.
Method and limits
- Output is reported by the operator or owner, never estimated here; the basis column says whether a figure is the whole operation or an owner's share. The general rules for shares, partial lists and basis are on the methodology page.
- Made with AI assistance and checked against the documents above (how the site is made). To report an error, contact us; fixes are logged on the corrections page.