Commodity Origins

El Porvenir (lead): a lead operation in Peru

El Porvenir (lead) is an underground mine producing lead in Peru (part of the Cerro Pasco Complex), Peru, operated by Nexa Resources. The sources report 25.2 thousand tonnes of lead contained in concentrates for CY2025 (year ended 31 December 2025); the basis is 100% of the mine, as reported by Nexa Resources. In lead content, whole-operation output for CY2025 is 25,200 tonnes: about 0.6% of world lead output in 2025 and about 8.7% of Peru's; it is one of 11 operations on this site whose output can be stated in lead content.

Who owns and operates it?

Owners of El Porvenir (lead)
OwnerInterestAs of
Nexa Resources (operator)
The 20-F says the mine is wholly owned by Nexa Resources El Porvenir S.A.C., which is 83.55% directly and indirectly owned by Nexa Resources.
83.55%31 December 2025

Interests as of the date shown.

How much does it produce?

Reported output of El Porvenir (lead)
PeriodOutputBasisWhere in the source
CY2025 (year ended 31 December 2025)25.2 thousand tonnes of lead contained in concentrates100% of the mine, as reported by Nexa Resourcesprinted p.34, Item 4 "Producing mines", El Porvenir paragraph: "25.2 thousand tonnes of lead contained in concentrates"; Earnings release (Form 6-K) printed p.23, El Porvenir table "(100% basis)", row "Production - metal contained - Lead", column 2025 · Nexa Resources S.A.
CY2024 (year ended 31 December 2024)26.8 thousand tonnes of lead contained in concentrates100% of the mine, as reported by Nexa Resourcesprinted p.23, El Porvenir table "(100% basis)", row "Production - metal contained - Lead", column 2024 · Nexa Resources S.A.

Between CY2024 (year ended 31 December 2024) and CY2025 (year ended 31 December 2025) the reported figure fell by 6.0%, in the same unit and on the same basis.

How the lead-content figure is worked out. Nexa Resources prints 25.2 thousand tonnes of lead contained in concentrates produced by the El Porvenir mine in 2025, and its earnings release labels the mine table "100% basis". The figure covers the whole mine. World mine production of lead in 2025 was 4,500,000 tonnes (USGS Mineral Commodity Summaries 2026); Peru produced 290,000 tonnes.

Of the 11 lead operations on this site with a stated lead-content figure, El Porvenir (lead) ranks 8th by whole-operation output. The largest, Red Dog (lead), is 107,000 tonnes; El Porvenir (lead) is 24% of that. Periods and bases differ between operators, so the ranking is indicative.

Status: operating, as of 31 December 2025.

How does it compare?

The 7 lead operations on this site closest to El Porvenir (lead) in whole-operation output, as stated by each operator (periods and bases differ, so the order is indicative):

lead operations of similar size to El Porvenir (lead)
RankOperationCountryOutput (tonnes of lead-content)Operator
5Rampura Agucha (lead)India42,000Hindustan Zinc
6Garpenberg (lead)Sweden38,692Boliden
7Zinkgruvan (lead)Sweden30,004Boliden
8El Porvenir (lead)Peru25,200Nexa Resources
9Southern Copper IMMSA unit (unit total)Mexico24,900Southern Copper
10Dugald River (lead)Australia21,666MMG
11Aripuanã (lead)Brazil13,000Nexa Resources

In Peru: Yauli unit (Volcan, unit total of three mines). See where lead comes from for the country totals, the country page for Peru, and Nexa Resources for its other operations here.

The same site is also listed for another commodity: El Porvenir (zinc).

Sources

Method and limits