Mutanda: a cobalt operation in DR Congo
Mutanda is a copper-cobalt mine producing cobalt in Lualaba Province, DR Congo, operated by Glencore. The sources report 10.6 kt cobalt contained in concentrates and hydroxides (Glencore 'Cobalt' line, Mutanda) for CY2025; the basis is as reported by operator (100% basis). In cobalt content, whole-operation output for CY2025 is 10,600 tonnes: about 3.4% of world cobalt output in 2025 and about 4.6% of DR Congo's; it is one of 4 operations on this site whose output can be stated in cobalt content.
Who owns and operates it?
| Owner | Interest | As of |
|---|---|---|
| Glencore | 95% | 31 December 2025 |
How much does it produce?
| Period | Output | Basis | Where in the source |
|---|---|---|---|
| CY2025 | 10.6 kt cobalt contained in concentrates and hydroxides (Glencore 'Cobalt' line, Mutanda) | as reported by operator (100% basis) | PDF p.10, table 'Production from own sources - Copper assets', Mutanda Cobalt row · Glencore plc |
| CY2024 | 7.9 kt cobalt contained in concentrates and hydroxides | as reported by operator | PDF p.10, same row, 2024 column · Glencore plc |
How the cobalt-content figure is worked out. Glencore reports 10.6 thousand tonnes of cobalt contained in concentrates and hydroxides for the operation, on a 100% basis, rounded to the nearest 100 tonnes. World mine production of cobalt in 2025 was 310,000 tonnes (USGS Mineral Commodity Summaries 2026); DR Congo produced 230,000 tonnes.
Of the 4 cobalt operations on this site with a stated cobalt-content figure, Mutanda ranks 2nd by whole-operation output. The largest, Kamoto Copper Company (KCC), is 22,900 tonnes; Mutanda is 46% of that. Periods and bases differ between operators, so the ranking is indicative.
Status: operating in CY2025.
- DR Congo suspended cobalt exports on 21 February 2025 and set export quotas from 16 October 2025 (USGS Mineral Commodity Summaries 2026), so reported cobalt output in 2025 reflects policy as well as capacity.
How does it compare?
The 4 cobalt operations on this site closest to Mutanda in whole-operation output, as stated by each operator (periods and bases differ, so the order is indicative):
| Rank | Operation | Country | Output (tonnes of cobalt-content) | Operator |
|---|---|---|---|---|
| 1 | Kamoto Copper Company (KCC) | DR Congo | 22,900 | Glencore |
| 2 | Mutanda | DR Congo | 10,600 | Glencore |
| 3 | Huayue Nickel Cobalt | Indonesia | 8,023 | PT Huayue Nickel Cobalt |
| 4 | Ramu nickel-cobalt | Papua New Guinea | 3,099 | MCC (Metallurgical Corporation of China) |
In DR Congo: Tenke Fungurume and Kisanfu (CMOC), Kamoto Copper Company (KCC). See where cobalt comes from for the country totals, the country page for DR Congo, and Glencore for its other operations here.
Sources
- Glencore plc: Resources and Reserves report 2025 (resources and reserves report, as at 31 Dec 2025). Opened 3 November 2026; used: PDF pp.9, 10, 31, 32, 34.
- Glencore plc: Full Year 2025 Production Report (production report / news release (29 January 2026), CY2025, CY2024). Opened 3 November 2026; used: pp.1, 2, 3, 5, 6, 10, 12.
- U.S. Geological Survey: Mineral Commodity Summaries 2026: Cobalt (government statistical summary, 2025 (world and country mine production)). Opened 3 November 2026; used: world and country mine production table.
Method and limits
- Output is reported by the operator or owner, never estimated here; the basis column says whether a figure is the whole operation or an owner's share. The general rules for shares, partial lists and basis are on the methodology page.
- Made with AI assistance and checked against the documents above (how the site is made). To report an error, contact us; fixes are logged on the corrections page.