Darling Range (Huntly and Willowdale): a bauxite operation in Australia

Darling Range (Huntly and Willowdale) is an open-pit mine producing bauxite in Darling Range, Western Australia, operated by Alcoa. The sources report 25.8 million dry metric tons (mdmt), zero-moisture basis for CY2025; the basis is 100% of the property, as reported by the operator (zero-moisture basis). Measured as bauxite, whole-operation output for CY2025 is 25,800,000 tonnes: about 5.9% of world bauxite output in 2025 and about 27% of Australia's; it is one of 9 operations on this site whose output can be stated in bauxite.

Who owns and operates it?

Owners of Darling Range (Huntly and Willowdale)
OwnerInterestAs of
Alcoa (operator)
The 10-K prints Alcoa's owners' mining rights as 100%, with Alcoa of Australia Limited as operator. The property comprises the Huntly and Willowdale mining centers.
100%31 December 2025

Interests as of the date shown.

How much does it produce?

Reported output of Darling Range (Huntly and Willowdale)
PeriodOutputBasisWhere in the source
CY202525.8 million dry metric tons (mdmt), zero-moisture basis
Alcoa's table is titled 'Summary of Attributable Annual Bauxite Production'; for Darling Range Alcoa's ownership is 100%, so attributable equals whole-property production.
100% of the property, as reported by the operator (zero-moisture basis)printed p.33, 'Summary of Attributable Annual Bauxite Production in mdmt', row Australia, Darling Range (Western Australia), 2025 column; zero-moisture statement printed p.32 · Alcoa Corporation
CY202427.7 million dry metric tons (mdmt), zero-moisture basis100% of the property, as reported by the operator (zero-moisture basis)printed p.33, same row, 2024 column · Alcoa Corporation

Between CY2024 and CY2025 the reported figure fell by 6.9%, in the same unit and on the same basis.

How the bauxite figure is worked out. Alcoa prints 25.8 million dry metric tons (zero-moisture basis) of attributable production for Darling Range in 2025. Alcoa's owners' mining rights are 100%, so the figure covers the whole property. The 10-K rounds to 0.1 million tons. Converted from million tons to tonnes. World bauxite mine production in 2025 was 440,000,000 tonnes (USGS Mineral Commodity Summaries 2026); Australia produced 97,000,000 tonnes.

Of the 9 bauxite operations on this site with a stated bauxite figure, Darling Range (Huntly and Willowdale) ranks 2nd by whole-operation output. The largest, Weipa (including Amrun), is 39,464,000 tonnes; Darling Range (Huntly and Willowdale) is 65% of that. Periods and bases differ between operators, so the ranking is indicative.

Status: operating, as of 31 December 2025.

How does it compare?

The 5 bauxite operations on this site closest to Darling Range (Huntly and Willowdale) in whole-operation output, as stated by each operator (periods and bases differ, so the order is indicative):

bauxite operations of similar size to Darling Range (Huntly and Willowdale)
RankOperationCountryOutput (tonnes of bauxite)Operator
1Weipa (including Amrun)Australia39,464,000Rio Tinto
2Darling Range (Huntly and Willowdale)Australia25,800,000Alcoa
3Sangaredi (Compagnie des Bauxites de Guinee)Guinea17,032,000CBG
4GoveAustralia12,729,000Rio Tinto
5Porto Trombetas (Mineracao Rio do Norte)Brazil11,560,000MRN

In Australia: Weipa (including Amrun), Gove. See where bauxite comes from for the country totals, the country page for Australia, and Alcoa for its other operations here.

Sources

Method and limits