Barruecopardo: a tungsten operation in Spain
Barruecopardo is a mine producing tungsten in Salamanca, Spain, operated by EQ Resources. The sources report 119,023 mtu (metric tonne units; 1 mtu = 10 kg WO3) of tungsten concentrate for FY2025 (1 July 2024 to 30 June 2025); the basis is whole mine, as reported by the owner-operator (the report's Saloro / Barruecopardo operations). The sources do not give a whole-operation figure in tungsten content that can be compared with world output, so no share is computed.
Who owns and operates it?
| Owner | Interest | As of |
|---|---|---|
| EQ Resources | 100% | 30 June 2025 |
How much does it produce?
| Period | Output | Basis | Where in the source |
|---|---|---|---|
| FY2025 (1 July 2024 to 30 June 2025) | 119,023 mtu (metric tonne units; 1 mtu = 10 kg WO3) of tungsten concentrate | whole mine, as reported by the owner-operator (the report's Saloro / Barruecopardo operations) | printed p.49 (PDF p.51), Operating and Financial Review, Saloro / Barruecopardo, Processing, sentence 'Annual tungsten production totalled approximately 119,023 mtu'; printed p.48 (PDF p.50), panel '119,000+ mtu produced FY2025 + 28% YoY' · EQ Resources Limited |
| Q4 FY2026 (quarter ended 30 June 2026) | 15,265 mtu (1 mtu = 10 kg 100% WO3), 'WO3 Produced' | whole mine, as reported by the owner-operator | PDF p.2, EQR Group Q4 FY2026 Performance Statistics Summary, row 'WO3 Produced', Barruecopardo column Q4 FY2026; PDF p.1 text 'production for the quarter totalled 15,265 mtu' · EQ Resources Limited |
Status: operating, as of 30 June 2026.
- The figure is mtu of WO3 produced in concentrate, not sales. The fiscal year ends on 30 June, so FY2025 covers 1 July 2024 to 30 June 2025 and is not the calendar year used by USGS.
- USGS prints 800 t of tungsten content for Spain in 2025 (estimated).
- The annual report prints the figure as 'approximately', so no share of world output is computed.
How does it compare?
Other tungsten operations on this site: Boguty, Mt Carbine, Chongyi Zhangyuan Tungsten mines (company total), China Tungsten and Hightech Materials tungsten concentrate (company total).
See where tungsten comes from for the country totals, the country page for Spain, and EQ Resources for its other operations here.
Sources
- EQ Resources Limited: Annual Report 2025 (financial year ended 30 June 2025; lodged with the ASX 30 September 2025) (annual report (ASX announcement), FY2025 (1 July 2024 to 30 June 2025), with FY2024 comparatives). Opened 6 November 2026; used: printed pp.8, 32, 48, 49, 55, 56, 59, 100 and the corporate directory (PDF page is printed page plus 2; the report is laid out in two-page spreads).
- EQ Resources Limited: Quarterly Activities Report, quarter ended 30 June 2026 (lodged with the ASX 28 July 2026) (quarterly activities report (ASX announcement), Q3 and Q4 FY2026 (quarters ended 31 March 2026 and 30 June 2026)). Opened 6 November 2026; used: PDF pp.1 and 2.
- U.S. Geological Survey: Mineral Commodity Summaries 2026: Tungsten (government statistical summary, 2025 (world and country mine production)). Opened 3 November 2026; used: world and country mine production table.
Method and limits
- Output is reported by the operator or owner, never estimated here; the basis column says whether a figure is the whole operation or an owner's share. The general rules for shares, partial lists and basis are on the methodology page.
- Made with AI assistance and checked against the documents above (how the site is made). To report an error, contact us; fixes are logged on the corrections page.